Everything about SAP Project System, in one place
Practical guides to the SAP PS module for consultants, key users and students: project structures, planning, budgeting, billing and closing, plus T-codes, tables and S/4HANA Fiori apps.
Most used PS transactions
CJ20N | Project Builder |
CJ40 | Change cost planning |
CJ30 | Change original budget |
CN41N | Project structure overview |
CJI3 | Actual cost line items |
CJ88 | Actual settlement |
Quick reference
The pages SAP PS consultants come back to most.
Transaction codes
Every important PS T-code, from CJ20N to settlement, grouped by process.
Database tables
PROJ, PRPS, AUFK, AFVC, JEST and the other tables you query every day.
S/4HANA Fiori apps
The Fiori apps for projects, WBS elements and networks, and how to find more.
Integration points
How PS connects with MM, SD, FI/CO, PP, PM, IM and HR.
The SAP PS project lifecycle
Follow a project from structure to settlement: each step explained with configuration and transactions.
Beyond Project System
Background on SAP itself, its technology and how implementations are run.
SAP basics
New to SAP? Start with what an ERP is and how the modules fit together.
Implementation methodologies
How SAP projects are run, from ASAP to SAP Activate.
Latest articles
Integration guides, industry use cases and interview preparation.

WBS Element in SAP: How to Create, Change and Display It
WBS elements in SAP PS: T-codes CJ11, CJ12, CJ13 and CJ20N, key fields, operative indicators, statuses, deletion, table PRPS and common problems.

WBS Budget in SAP: How to Check It and Fix Budget Exceeded Errors
How to check a WBS budget in SAP (S_ALR_87013558, CJ31), what counts as assigned in availability control, and how to fix budget exceeded errors.

What Changed for SAP PS in S/4HANA
SAP Project System in S/4HANA: what stays the same, what changed (Universal Journal, revenue recognition, Fiori) and what it means for PS consultants.
Thinking about an SAP career?
The main SAP job profiles, what they do and how to get started.